Where quality is checked
Key checkpoints in the fabrication process:
- Lumber grade and species verified against the truss design
- Member cuts checked for length and angle
- Connector plate size, gauge, and placement verified against design drawings
- Assembled truss dimensions checked on the table
- Bundles labeled and sequenced for the job site
On-site handling
Correct storage, lifting, installation, and bracing are critical to truss performance. We recommend installers follow the BCSI guide published by the Structural Building Components Association and the Truss Plate Institute.
Frequently asked
What happens if a truss arrives damaged?
Do not install a damaged truss. Contact our team right away with photos so we can advise on repair or replacement.
